The plant in Rotterdam, the biggest one in Holland and the sixth one in the world for its capacity, has been realized by the joint-venture between Techint E&C Italia-SENER and TSEV Consortium. Gate is one of the biggest terminals LNG (Liquified Natural Gas) in Europe, with initial productive capacity of 12 billion m³/year and three storage tanks of 180.000 m³. The terminal can satisfy natural gas requirements of all population of Netherlands and some part of Europe. The total value of the project is 800 million EUR.